Permalink | Print | Email to Friend
|
More in: How-To, Diesel, Dodge, Engine, Fuel Step 2: Remove the bolt and move the wiring harness off of the mounting pad location. The wiring harness will wrap underneath the bracket when completed. Install the bracket (Item #11 ) in the location shown above. Bolt the bracket to the mounting pad using the metric bolts (PN#B-4 ) (Item #12 ) and metric lock washers (PN#L-2 ) (Item #13). Torque the bolts to 30-35 lb. ft.
Discuss now in our forums: Lightening the Lightning 2005 SRT-10 Quad Cab? TS Performance Breaks Pro Street Record Dodge Nitro, a Smaller SUV, Blasts Off in 2006 Dodge Introduces The 05 Powerwagon 2005 Dodge Ram SRT-10 Quad Cab Gov Investigating Dodge Dakota and Durango Banks' Diesel-Dual! Monster Exhaust Friday Beerblog: Forget Something? Feds Urge Dodge to Recall 600K Trucks
|

